Food Oil filling machine
this machine is specially design in rotary type ,the machine is running by rotary washing,-the technolgy imported from gernmany , the washing capacity depand on the customer requirement , the washing air is from asepesis compressing air , it will get high stardard clean bottle.
-Main Structure and Work Principle
1 Main Structure:Stander and Sealing Window,Gearing,Filling System,Bottle Convey Device,Quantity Guide Rail,Capping System and Appliance Controller ETC.
2.Stander and Sealing Window:Stander is used to install gearing system,supporting rotational part and safety window of filling machine.
3.Gearing: there are some parts on the working bedplate such as conveying device for inletting and outletting bottles, main dial, upright post of ration guide rail and so on. Under the working bedplate, there is gearing including main motor, transmission worm gear, overloading protection and braking device. They are used to assure above-mentioned parts run.
4.Filling System:It is the core of the whole machine including filling tank,valve body,piston Etc.
5.Vacuum anti-leakage device:It is used to wipe off the remaining oil drop on the filling nozzle after finishing filling so that prevent the oil drop contaminating the bottle and machine surface
6.Bottle conveying device: it is the bottle conveying system of filling and capping process, including bottle air conveying channel,, bottle feeding and outputting thumbwheel, different kinds of bottleneck baffle, etc.
7.Ration Guide Rail:Adjust the travel route within certain range and control filling quantity of material during the course of filling.
8.Cap Screw System:It includes cap rotating head,efficient cap sorter,cap slide channel,positive and negative cap inspection wheel,cap lack inspection,they can assure the capping quality.
Installation and Debugging
-- We will send engineers to carry out installation and debugging of the equipment in buyer's place if requested.
-- The cost for International double ways air tickets, accommodations, food and transportations, medical shall be paid by Buyer for the engineers.
-- The normal debugging term is 3-7days, and the buyer should pay US$80/day per engineer.
-- If customer do not require above, then customer need to be train in our factory. Before installation, the customer need read the operation manual firstly. Meanwhile, we will offer an operation video to customer.
Training
-- We offer machines training system; the customer can choose training in our factory or in customer workshop. The normal training days are 1-2 days.
Warranty
-- The sold machine will be guarantee in one year.
-- In the guarantee year, any spare parts broken due to supplier's quality issue the spare parts will be supplied free for customer, customer need to pay the freight cost if the parcel weight more than 500gram.
-- The easy wearing out spare parts are not in the warranty terms, such as O rings, belts which will be supplied with the machine for one year using.